| 2007 | July | Leakage Reparation on Concrete Walls and Roof at Medium Voltage Room and Low Voltage Room until Boiler Room in the Imperial Aryaduta Hotel Makassar - Ujungpandang | PT. BUMINDO GANESHA PT. LALOLO | 500 | M2 | Hydrocap |
| | November | Waterproofing Renovation on the Roof, Gutter, Top Roof and Walls at Pavilion of Deputy Head Economic Dept. of The France Embassy, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 500 | M2 | Sovacryil Davco SK2000 S |
| | | Leakage Reparation on Walls and Floor at Sewage Treatment Room in Aryaduta Hotel Pekanbaru, Riau | PT. BUMINDO GANESHA PT. LALOLO | 1,600 | M2 | Hydrocap |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 2007 | July | Leakage Reparation on Concrete Walls and Roof at Medium Voltage Room and Low Voltage Room until Boiler Room in the Imperial Aryaduta Hotel Makassar - Ujungpandang | PT. BUMINDO GANESHA PT. LALOLO | 500 | M2 | Hydrocap |
| | November | Waterproofing Renovation on the Roof, Gutter, Top Roof and Walls at Pavilion of Deputy Head Economic Dept. of The France Embassy, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 500 | M2 | Sovacryil Davco SK2000 S |
| | | Leakage Reparation on Walls and Floor at Sewage Treatment Room in Aryaduta Hotel Pekanbaru, Riau | PT. BUMINDO GANESHA PT. LALOLO | 1,600 | M2 | Hydrocap |
| 2007 | February | Aeration Basin Project PT. PEC-TECH INDONESIA (PT. Riau Andalan Pulp and Paper), Pekanbaru, Riau | PT. Duta Graha Indah | 38,660 | M2 | |
| | March | Flat Roof Concrete Leaked Repair at Restaurant 128 Terminal B and C Soekarno–Hatta International Airport | CV. Karunia Sulang Abadi | 500 | M2 | Cosmodien Granules 4 mm |
| | May | Building 641 Flat Roof Concrete Leaked Repair in Soekarno–Hatta International Airport | CV. Karunia Sulang Abadi | 750 | M2 | Cosmodien Granules 4 mm |
| | | | | | | |
| 2006 | February | Waterproofing Installation on the Roof at Arcade Building, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 500 | M 2 | Sopralene 4 S/P |
| | | | | | |
| | March | Gallery National | PT. Thamrin Citra Mulia | 500 | M 2 | Sopralene 4 mm |
| | April | Watertank Cikarang | PT. Mira Nila | 600 | M 2 | Hydrocap |
| | June | Bathroom at Apartment Spring Tower Lt. 5 Tower B | PT. BUMINDO GANESHA PT. LALOLO | 550
| M 2
| Cosmodien 3 mm
|
| | | Restaurant at Senayan City | PT. BUMINDO GANESHA PT. LALOLO | 500 | M 2 | Roofgum 3 mm |
| | August | Renovation Air Mancur at Mall Taman Anggrek | PT. BUMINDO GANESHA PT. LALOLO | 600 | M 2
| Hydrocap
|
| | | Restaurant Mie & Mie, Cinere Mall | PT. Medal Alam Sari | 500 | M 2 | Cosmodien 3 mm |
| | November | Floor and Wall Trench Medium Voltage cabel at Imperial Aryaduta Hotel, Makassar | PT. BUMINDO GANESHA PT. LALOLO | 1,200 | M 2 | Hydrocap |
| | December | Warehouse 1 - 4 PT Sarana Abadi Lestari, Samarinda | PT. BUMINDO GANESHA PT. LALOLO | 2,500 | M 2 | Hydrocap |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 2005 | July | Renovation Waterproofing of Building A SKKL Ancol, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 1,287 | M 2 | Roofgum 3 mm Cosmodien granules 4 mm |
| | December | Waterproofing Renovation on the Roof and Gutter at House of Deputy Head Economic Dept. of The France Embassy, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 500 | M 2 | Sopralene 3 S/P (2 layers) Cural |
| | | | | | |
| 2005 | January | Showroom at PT. Agia Wira Utama, Jl. Pengangsaan Dua, Kelapa Gading, Jakarta | CV. Citra Pratama | 1,000 | M 2 | Roofgum 3 mm |
| | | Waterproofing at Roof in US Embassy Jakarta | PT. Polatama Intikencana | 500 | M 2 | Sopralene 4 S/P |
| | April | Showroom Roofing at Honda Sales Operation, PT Astra International Tbk, Jl. A. Yani, Palembang | PT. Waringin Megah | 540 18 | M 2 M 2 | Sopralene 3 S/P Coatmem |
| | May | Waterproofing for GRC Gutter at New Padang Airport Construction Project, Padang | Shimizu - Adhi Karya - Marubeni J.O. | 2,500 | M 2 | Built-up Roofing 2 layers Cosmodien Granules 4 mm (top layer) |
| | | | | | | |
| 2004 | January | New Padang Airport Construction Project, Padang Pariaman, Sumatera Barat (signed contract in January) | Shimizu - Adhi Karya - Marubeni J.O. | 30,000 10,000 | M² M² | Built-up Waterproofing Insulation Board |
| | | Renevation of Anjungan Roof and Flat Gutter in Terminal 2, Soekarno-Hatta Airport | CV. Karunia Sulang Abadi | 1,250 | M² | Cosmodien Granules 4 mm Cosmodien 3 mm |
| | April | Renovation Flat Gutter overlap in Curb Side, Transit and Boarding Lounge Terminal 2, Soekarno-Hatta Airport | CV. Karunia Sulang Abadi | 850 | M² | Sopralene 3 mm Cosmodien Granules 4 mm |
| | May | Waterproofing Renovation on concrete roof 601 Building at Block B, C, A-B, A-D, Soekarno-Hatta Airport | CV. Bina Taruna | 1,600 | M² | Sopralene 3 mm Cosmodien Granules 4 mm |
| | | Palembang Airport Construction Project, Talang Betutu, Sumatera Selatan | Hazama Corporation | 32,740 16,370 1,100 874 | M² M² M² M² | Built-up Roofing 3 layers Roofgum 3 mm Gutter: Cosmodien Granules Gutter: 4 mm Toilet : Roofgum 3 mm |
| | September | Renovation of Leaking at Anjungan Roof in Terminal E, Soekarno-Hatta Airport | C.V. Bina Taruna | 1,376 | M² | Cosmodien Granules 4 mm |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 2003 | December | Waterproofing Renovation on Roof and Floor between G Line to M Line in To Building 611, Soekarno-Hatta Airport | CV. Surya Mekar | 1,000 | M² | Cosmodien 3 mm |
| | | Renovation of Deletation at Terminal 2, Soekarno-Hatta Airport | PT. BUMINDO GANESHA PT. LALOLO | 500 | M² | Cosmodien Granules 4 mm |
| | | | | | | |
| 2003 | January | Rating School Establishment Project, application of waterproofing for Roofand Toilet, in Tangerang | Shimizu - Dextam J.O. | 23,535 411 | M² M² | Roofing Felt 3 layers Polyurethane Waterproofing Coating |
| | May | Rating School Establishment Project, application of waterproofing coating, Tangerang | PT. Muri Agung Abadi | 2,000 | M² | Hydrocap Waterproofing Crystalline |
| | July | Renovation of Daag Roof Main Building Terminal on 1 st Floor in Halim Perdanakusuma Airport | PT. BUMINDO GANESHA PT. LALOLO | 4,373 | M² | Sopralene 3 mm |
| | September | TKI Facility Building and JAS-Silver Kris Lounge at Terminal II-D, Soekarno-Hatta Airport | PT. Samodra Gunadharma Utama | 1,500 | M² | Cosmodien Granules 4 mm |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 2002 | March | Renovation on roof Menara PT. (Persero) Angkasa Pura II, Soekarno-Hatta Airport | PT. BUMINDO GANESHA PT. LALOLO | 270 | M² | Palladien 3 mm |
| | | Renovation of Waterproofing on Anjungan Terminal D E F at Soekarno-Hatta Airport | PT. BUMINDO GANESHA PT. LALOLO | 455 | M² | Sopralene 4 mm |
| | May | Renovation on Linking Corridor Terminal E & F Soekarno-Hatta Airport | PT. BUMINDO GANESHA PT. LALOLO | 1,300 | M² | Epoxy |
| | June | Perluasan Terminal Domestic at Polonia Airport, Medan | PT. Empaco Try Lady | 800 | M² | Cosmodien 3 mm |
| | July | Renovation Leaking of Daag Roof Terminal Domestic at Polonia Airport, Medan | PT. Yuddi Agung | 3,024 | M² | Cosmodien 4 mm |
| | August | Proyek Pekerjaan Epoxy Coating at PT. Tensia Manufacturing Indonesia | PT. BUMINDO GANESHA PT. LALOLO | 1,603 | M² | Epoxy |
| | November | Renovation of Daag Roof Main Building Terminal on 1 st Floor and 2 nd Floor in Halim Perdanakusuma Airport | CV. Suminar | 4,373 | M² | Palladien 3 mm |
| | December | Renovation of Waterproofing Leaking at Anjungan Terminal D, E & F, Soekarno-Hatta Airport | CV. Bina Taruna | 1,257 | M² | Cosmodien 3 mm, Cosmodien Granules 4 mm, Curnoir |
| | | Build New Talang at Transit Extension Terminal D & E, Soekarno-Hatta Airport | CV. Karang Kamulyan | 1,400 | M² | Cosmodien 3 mm, Cosmodien Granules 4 mm, Epoxy Coating |
| | | | | | | |
| 2002 | February | Renovation on trimdek roof Function Room and 2 unit of Talang at The Aryaduta Hotel, Pekanbaru | PT. BUMINDO GANESHA PT. LALOLO | 800 | M² | Trimdek Sopralene Granules 4 mm |
| | March | Renovation at Balai Latihan Perpajakan Kemanggisan, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 650 | M² | Cosmodien Granules 4 mm |
| | | | | | | |
| 2001 | January | Roof renovation at JPT and 501 building, Soekarno-Hatta Airport | PT. Bonita Indah Perkasa | 1,547 1,685 | M² M² | Palladien 3 mm Palladien Granules |
| | | Renovation at connecting Term. I, Soekarno-Hatta Airport | PT. BUMINDO GANESHA PT. LALOLO | 1,337 | ML | Self Adhesive |
| | | Renovation at Jenderal Soedirman Museum building, Purwokerto | PT. BUMINDO GANESHA PT. LALOLO | 525 | M² | Cosmodien 3 mm |
| | June | Waterproofing Renovation on roof and gutter at the airport platform Terminal DEF, Soekarno-Hatta Airport | PT. BUMINDO GANESHA PT. LALOLO | 521 | M² | Sopralene 4 S/P Self Adhesive |
| | August | Renovation Talang Datar, Talang Miring dan Anjungan Terminal D E F Soekarno-Hatta Airport | PT. BUMINDO GANESHA PT. LALOLO | 190 | M² | Sopralene 3 S/P Self Adhesive |
| | November | Renovation of Delatasi at The Aryaduta Hotel, Pekanbaru | PT. BUMINDO GANESHA PT. LALOLO | 200 | ML | Sopralene 4 mm Sopralene Granules 4mm |
| | | Renovation of Waterproofing on Linking Corridor Terminal E & F at Soekarno-Hatta Airport | PT. BUMINDO GANESHA PT. LALOLO | 120 | M² | Epoxy |
| | | | | | | |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1999 | Oktober | Sekolah Prancis, Cipete Dalam No: 32, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 160 52 | M² M² | Cosmodien 3 mm Curnoir |
| 2000 | February | Renovation at Container I, PT. MULIAGLASS Cikarang (Injection) | PT. BUMINDO GANESHA PT. LALOLO | 400 | dot | Hydrocap, HCMM & Grouting |
| | April | Roof renovation at VIP ROOM, Soekarno-Hatta Airport | PT. Mega Persada Utama | 810 | M² | Palladien 3 mm |
| | August | Renovation at Terminal D - F, Soekarno-Hatta Airport | PT. Bernike Dansina Jaya | 1,158 | M² | Palladien Granules Expose |
| | | Roof renovation at Cargo 521 building, Soekarno-Hatta Airport | CV. Beta Lestari Prima | 1,138 | M² | Palladien 3 mm |
| | November | Renovation at Float I, PT. MULIAGLASS Cikarang (Injection) | PT. BUMINDO GANESHA PT. LALOLO | 1,489 | dot | Hydrocap, HCMM & Grouting |
| | | | | | | |
| 1999 | January | Renovation at roof Mosque Depnaker, Jl. Gatot Subroto, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 786 | M² | Mamut 300 |
| | February | Renovation at Terminal A, Soekarno-Hatta Airport : Main Roof, Canopy, Galeri, Chiller PT. (Persero) Angkasa Pura II | PT. BUMINDO GANESHA PT. LALOLO | 12,798 | M² | Sopralene 3 S/P & 4 S/P |
| | | Renovation at Terminal B, Soekarno-Hatta Airport : Main Roof, Atap AC, Canopy, and Galeri PT. (Persero) Angkasa Pura II | PT. BUMINDO GANESHA PT. LALOLO | 12,916 | M² | Cosmodien 3 mm |
| | Maret | Roof + Daag Pump and WaterRoom Feature Bank Indonesia | PT. Wijaya Karya | 1,096 | M² | Sopralene 4 S/P |
| | April | Renovation at Terminal C, Soekarno-Hatta Airport | PT. Penta Valent | 1,268 | M² | Sopralene Flam ALU 4mm |
| | | | | | | |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1997 | September | Perumahan Taman Grisenda Block B II, B III, B IV, Jakarta | CV. Media Cipta Perkasa | 1,660 | M² | Curnoir |
| | October | Basement 2 at Kandatel Bogor Building | PT. Wijaya Karya | 3,581 | M² | Cosmodien 4 mm |
| | November | Roof renovation at Ambassade de France, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 470 | M² | Sopralene Granules |
| | December | Roofing at Jakarta Hilton International Hotel for THR area 1 | PT. BUMINDO GANESHA PT. LALOLO | 1,260 | M² | Sopralene Granules |
| | | | | | |
| 1998 | January | Ramp Tower A & B Bank Indonesia Building | PT. Wijaya Karya | 278 | M² | Sopralene 4 S/P |
| | May | Roofing at Puri Kemayoran Apartment, Jakarta | PT. Tunas Jaya Sanur | 500 6,000 | M² M² | Curnoir Cosmodien 3 mm |
| | June | Steel Gutter renovation at Toshiba Maintenance Project | PT. Sumicon Utama | 2,766 2,766 | M² M² | Curnoir Cural |
| | July | Podium Phase 1 - Menara 7 Gading, Jakarta | PT. Putra Surya Perkasa | 4,000 | M² | Cosmodien 3 mm |
| | | Podium Phase 2 - Menara 7 Gading, Jakarta | PT. Putra Surya Perkasa | 7,000 | M² | Cosmodien 3 mm |
| | September | Waterproofing with 2 layers at roof lobby entrance above car call & renoval & resistance the white gravel at Jakarta Hilton International Hotel | PT. Indo Builco | 646 | M² | Mamut 300 Cosmodien 3 mm |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1996 | December | Roofing at YKPP Matraman Building | PT. Wiradanu Tunggal Putra | 600 | M² | Multigum Garden |
| | | | | | |
| 1997 | January | Parkir Tower II at BAPINDO 2, Jakarta | PT. Putra Duta Anggada | 1,220 | M² | Sopralene 3 S/P |
| | | Balcony & Toilet at Tower 1 Pavillion Park Apartment, Jakarta | PT. Putra Duta Anggada | 720 3,270 | M² M² | Sopralene 3 S/P Curnoir |
| | | Balcony & Toilet at Tower 3 Pavillion Park Apartment, Jakarta | PT. Putra Duta Anggada | 720 3,270 | M² M² | Sopralene 3 S/P Curnoir |
| | | Cooling & Water Reservoir at PT. MuliaGlass Container Line #3 | PT. Mulia Glass | 2,120
| M² | Hydrocap |
| | March | Reservoir & Genset room at Pusat Perbelanjaan Muara Karang | PT. Artha Garis Persada | 2,000 1,000 | M² M² | Multigum Garden Curnoir |
| | April | Balcony & Toilet at tower #4 Pavillion Park Apartment | PT. Putra Duta Anggada | 500 90 | M² M² | Sopralene 3 S/P Curnoir |
| | | Roofing at tower # 1& 3 Pavillion Park Apartment | PT. Putra Duta Anggada | 1,200 | M² | Curnoir |
| | | UNTAR II Phase I | PT. Dharma Mulyadi | 626 | M² | Sopralene 3 S/P |
| | | Auto Center Indomobil Apartment | PT. Mandalika Sapta Karsa | 800 | M² | Multigum 3 mm |
| | June | Roofing at Kantor Gubernur Sumut | PT. PP Cabang Medan | 4,000 | M² | Cosmodien 3 mm |
| | | Roofing at Balai Sudirman, Jakarta | PT. Wijaya Perdana | 4,000 | M² | Cosmodien 3 mm |
| | | Tower at Pavillion Park Apartment | PT. Putra Duta Anggada | 2,240 | M² | Sopralene 3 S/P |
| | | Bank Indonesia Building | CV. Indo Djati | 608 | M² | Sopralene 4 S/P |
| | | Krakatau Steel Wire Rod Mill | PT. P.P. Taisei Indonesia | 620 | ML | Waterstop |
| | August | Toilet Fl. 2-8 at Banian Boulevard Hotel | PT. Thanaland Indah | 583 988 | M² M² | Cosmodien 3 mm Curnoir |
| | | Renovation at Bappenas Building, Jakarta | PT. PP Cabang III | 1,325 | M² | Sopralene 3 S/P & 4 S/P |
| | | Pembangunan Pabrik Percetakan Uang Logam Peruri | PT. Hutama Karya Cab. V JABOTABEK | 9,470 | M² | Sopralene 4 S/P |
| | | Kantor KDH Tingkat 1, Sumut | PT. PP Cabang I Medan | 650 | M² | Roofigum 3 mm |
| | September | Balcony room 25 & 26 Floor, Tower 1 & 3 at Pavilion Park Apartment | PT. Putra Duta Anggada | 1,000 | M² | Sopralene 3 S/P |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1996 | March | Gobel Development Corporation | PT. Binangun Artha Bandayo | 1,200 600 | M² M² | Hydrocap Multigum 3 mm |
| | April | Sanno Pluit Hotel, Jakarta | PT. Patama Adijaya Steel | 760 1,000 | M² M² | Sopralene 4 S/P Sopralene 4 S/P |
| | May | Basement at Puri Kemayoran Apartment, Jakarta | PT. Putra Duta Anggada | 10,000 | M² | Cosmodien 3 mm |
| | | Taman Anggrek Apartment Roofing, toilet, bathroom & service area. Parking Area 7 th & 8 th Floor | PT. Mulia IntiPelangi Waterproofing Membranes dan Coating 147.206 m2 yang terdiri dari : | 36,834 23,000 53,155 22,000 12,217 | M² M² M² M² M² | Multigum 3 mm Mult. Garden Curnoir DRY A-2 Hydrocap |
| | | Tropic Apartment | PT. Nusa Raya Cipta | 3,000 | M² | Palladien 3 mm |
| | June | Muliaglass Float Line #3 | PT. BUMINDO GANESHA PT. LALOLO | 1,575 | M² | Hydrocap |
| | July | Boulevard Travelodge Hotel & Apartment | PT. Duta Graha Indah | 15,000 | M² | Palladien 3 mm |
| | | Pusat Data Bank Danamon Building | Kaliraya Jaya Jo. | 11,640 | M² | Multigum 3 mm |
| | August | Wall & Floor Basement at Museum & Bayt Alqur'an - TMII | PT. Exotica | 7,870 | M² | Hydrocap |
| | | Cooling Tower & Batch Plant Float Line # 3 | PT. Mulia Glass | 1,085 | M² | Hydrocap |
| | September | Main Tunnel, Cooling Duck Plan, Water Reservoir, Batching Plant & Freight Elevator Float Line 3 | PT. Mulia Glass | 6,000 | M² | Hydrocap |
| | | Reservoir at Texmaco | PT. Polysindo Eka Perkasa | 1,565 | M² | Hydrocap |
| | October | Roofing at Denma Denkes Kalibata | PT. Wijaya Perdana | 1,090 | M² | Roofgum 3 mm |
| | | Toilet & Canopy at Pavilion Park | PT. Putra Duta Anggada | 7,470 2,640 | M² | Curnoir Sopralene 3 S/P |
| | November | Combined Cycle Power Plant at KMT | PT. BUMINDO GANESHA PT. LALOLO | 3,020 | M² | Epoxy Coating |
| | | Kali Raya Sari Building | PT. Total Bangun Persada | 910 1,450 | M² M² | Curnoir Multigum 3 mm |
| | December | Auto 2000 Building, Cempaka Putih | PT. Nusa Raya Cipta | 900 | M² | Cosmodien 3 mm |
| | | Toilet, Roofing & Garden at Puri Kemayoran Apartment, Jakarta | PT. Putra Duta Anggada | 6,000 2,500 600 | M² M² M² | Cosmodien 3 mm Curnoir Multigum Garden |
| | | Citra Indah Kota Nuansa Alam Timur | PT. Katuma | 1,085 | M² | Sopralene 3 S/P |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1996 | January | Waterfall at Taman Monas II, Jakarta | PT. Hutama Karya | 7,520 | M² | Sopralene 3 S/P |
| | March | Balai Sudirman, Jakarta | PT. Wijaya Perdana | 10,000 | M² | Multigum 3 mm |
| | | Wall at MM 2100, Sanyo - Cibitung | PT. Erkawiduri Kencana | 1,850 | M² | DRY A-2 |
| | | Basement at Kantor Gubernur, Sumatera Utara | PT. PP Cabang Medan | 6,000 | M² | Cosmodien 3 mm |
| | | | | | | |
| 1995 | April | Golf Club House Project at PT. Free Port, Irian Jaya | PT. BUMINDO GANESHA PT. LALOLO | 570 10,960 | M² M² | Eshagum 3 S/P Asphalt Roofing Felt |
| | | Gondangdia Apartment, Jakarta | PT. Nusa Raya Cipta | 3,000 | M² | Sopralene 3 S/P |
| | | Labiomed AD, Munjul, Cibubur Project | PT. Rentjana Persada | 1,100 | M² | Cosmodien 3 mm |
| | | Ruko Mitra, Pintu Air Project | PT. BUMINDO GANESHA PT. LALOLO | 500 | M² | Cosmodien 3 mm |
| | May | Gelanggang Olah Raga Bulungan, Jakarta | PT. Nurabadi | 800 | M² | Cosmodien 3 mm |
| | | Renovation at Dustira Hospital, Cimahi | PT. Matahari Sumber Dunia | 1,125 | M² | Roofgum 3 mm |
| | | Masjid AR- Rahmah, Garut, Jawa Barat | PT. Dian Sakti Lestari | 575 | M² | Sopralene 3 S/P |
| | | Kampus STPDN, Bandung | PT. Properllad | 745 | M² | Multigum 3 mm |
| | | Auto 2000, Kramat Jati | PT. Lentera Permai Utama | 800 | M² | Palladien 3 mm |
| | | Science Centre, TMII | PT. Wijaya Kusuma Kontraktor | 7,735 | M² | Roofgum 3 mm |
| | July | Asahi Mas III-1, Anyer | PT. PP Taisei Indonesia Contr. | 500 | M² | Sopralene 3 S/P |
| | | Wisma BSG Building, Tanah Abang, Jakarta | PT. Dwibina Prima | 1,815 | M² | Sopralene 3 S/P |
| | | Ruko Buncit Mas, Jakarta | PT. Griyarona Andalan Pratama | 4,500 | M² | Roofgum 3 mm |
| | | Floor Parking Area II at Tower II, Bapindo, Jakarta | PT. Pembangunan Perumahan | 5,950 | M² | Sopralene 3 S/P |
| | September | Royal gading & Golf Club at Serpong | PT. Nusa Raya Cipta | 2,300 | M² | Roofgum 3 mm |
| | October | Roofing at Steam Power Plant Project Suralaya, unit 5, 6 & 7 (C-57) | PT. Ssangyong | 1,200 | M² | Asphalt Roofing Felt 4 layers with insulation 2 layers |
| | September | Royal gading & Golf Club at Serpong | PT. Nusa Raya Cipta | 2,300 | M² | Roofgum 3 mm |
| | October | Roofing at Steam Power Plant Project Suralaya, unit 5, 6 & 7 (C-57) | PT. Ssangyong | 1,200 | M² | Asphalt Roofing Felt 4 layers with insulation 2 layers |
| | November | Roofing, toilet, ground tank at Pertamina Hospital, Jakarta | PT. Hutama Karya | 7,520 | M² | Sopralene 3 S/P |
| | December | Basement at Graha Pratama, Jakarta | PT. Jaya Konstruksi | 5,000 | M² | Multigum 3 mm |
| | | Roofing at Kejaksaan Agung RI, Jakarta | PT. Angrilam Simta Mandiri | 2,000 | M² | Palladien 3 mm |
| | | Kopkar Bafins (A Bakrie Company) | PT. BUMINDO GANESHA PT. LALOLO | 1,200 | M² | Multigum 3 mm |
| | | | | | | |
| 1995 | January | PLTGU, Cirebon | PT. BUMINDO GANESHA PT. LALOLO | 600 | M² | Sopralene 3 S/P |
| | February | Roofing at B-4 Building, Cilangkap | PT. Dwipa Bhirawa Persada | 1,500 | M² | Multigum 3 mm |
| | March | Basement at Harley Davidson, Kemang, Jakarta | PT. Minsuco Konstruksindo | 1,290 | M² | Cosmodien 3 mm |
| | | Roofing at Citraland, Semarang | PT. Dimensi Engineering Contr. | 3,000 | M² | Palladien 3 mm |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | AREA | MATERIAL |
| 1994 | February | Roofing & Basement at Haka Building, Jl. Wahid Hasyim No. 16, Jakarta | PT. Assa Jaya Purnadipta | 4,000 | M² | Sopralene 3 S/P Sopralene Granules |
| | | PT. YKK, Tangerang | Hutama - Kadi, JO | 290 | M² | Eshagum 3 S/P |
| | | Roofing at OPMC Jakarta | PT. Budi Agung Wibawa | 660 | M² | CURNOIR |
| | | Mr. Idris Ranadipura Residence Jl. Bintaro Menteng Raya Blok PG 1 No. 26 Sektor V, Bintaro Raya, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 500 | M² | Sopralene 4 S/P Sopralene 3 S/P |
| | April | Wall at PT. Jagad Karimba Nusa, Cikarang | PT. Jaya Obayashi | 690 | M² | Eshagum 3 S/P |
| | | Roofing, wall & toilet at Murti Indah Sentosa Building | PT. Binangun Artha Bandayo | 600 1,150 | M² M² | Sopralene 3 S/P Hydrocap |
| | | Mrs. Yona Residence at Komp. Perum. Haka | PT. BUMINDO GANESHA PT. LALOLO | 150 | M² | Sopralene 3 S/P |
| | | Roofing & Toilet for deletation at Pelabuhan Udara Hang Nadim - Batam | PT. Hyundai Eng. & Const. | 10,700 1,300 | M² M² | Sopralene Granules 4 mm Curnoir |
| | June | Basement floor & roofing at Dusit Mangga Dua Hotel & Shopping Center, Jakarta | PT. Jaya Konstruksi MP | 25,355 10,605 485 | M² M² M² | Sopralene 4 S/P Sopralene 3 S/P Sopralene Granules |
| | | Basement & Roofing at Agro Plaza Kuningan | PT. Duta Graha Indah | 6,000 | M² | Cosmodien 4 mm |
| | | PLN Building, Jl. Trunojaya, Jakarta | PT. Duta Graha Indah | 3,000 | M² | Roofgum |
| | | Citraland, Semarang | PT. Jaya Konstruksi MP | 6,000 | M² | Cosmodien |
| | September | Auto 2000, Jl. Salemba, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 2,000 | M² | Palladien 3 MM |
| | | Bank Exim Building, Jl. Gatot Subroto, Jakarta | PT. Exotica | 17,000 | M² | Sopralene Granules - Jardin 4 mm |
| | November | Kantor Pusat PT. (Persero) Asuransi Kesehatan Cempaka Putih Building, Jakarta | PT. Indo Mulya Mitra Jaya | 1,350 | M² | Cosmodien |
| | | Basement & Roofing at PLTGU Building | PT. BUMINDO GANESHA PT. LALOLO | 560 | M² | Sopralene 3 S/P |
| APPLICATION DATE | PROJECTS | MAIN CONTRACTOR | AREA | MATERIAL |
| 1994 | January | Roofing at Sunter Mall | PT. Reka Arcomindo Utama | 2,890 | M² | Eshagum 3 S/P |
| | | Roofing at Annex BNI Building, Medan | PT. Adhi Manunggal Prana | 500 | M² | Eshagum 3 S/P |
| | February | Roofing at Jl. Pluit Samudra No. 16, Jakarta | PT. Yakin Maju | 500 | M² | Eshagum 3 S/P |
| 1993 | June | Roofing at ARSIP CMI Building, Krakatau Steel | CV. Mouliska | 700 | M² | Sopralene 3 S/P |
| | July | Roofing & Toilet at Puri Bank Exim, Jakarta | PT. Bangun Cipta Sarana | 13,000 | M² | Soprasun 4 S/P |
| | August | Swimming Pool at Biak Beach Hotel, Irian Jaya | PT. Puri Indra Bayu | 2,280 | M² | Sopralene 4 S/P |
| | | Roofing at Sasono Budoyo Utomo - TMII, Jakarta | PT. Wijaya Kusuma Kontraktor | 2,000 | M² | Eshagum 3 S/P |
| | | Basement floor & wall at Parking area Jatinegara Plaza, Jakarta | PT. Putra Duta Anggada | 10,600 1,300 3,900 | M² M² M² | Sopralene 4 S/P Sopralene 4 S/P Sopralene 4 S/P |
| | | Renovation at Japanese Embassy, Jl. M.H. Thamrin No. 24, Jakarta | PT. PP Taisei Indonesia Const. | 1,270 | M² | Sopralene 4 mm Granules |
| | September | Roofing at PT. Eragraha, Jakarta | PT. Pembangunan Perumahan | 1,000 | M² | Eshagum 3 S/P |
| | | Basement at Sahid Palace Executive Apartment, Jakarta | PT. Jaya Konstruksi | 20,000 | M² | Hydrocap |
| | | Roofing at Plaza Bintaro | PT. Dimensi Engineering Const. | 4,610 | M² | Sopralene 4 S/P |
| | | Roofing at Air Limbah Perum Peruri Building | PT. Adiawira Pratama | 1,000 | M² | Curnoir |
| | September | Roofing at PT. Eragraha, Jakarta | PT. Pembangunan Perumahan | 1,000 | M² | Eshagum 3 S/P |
| | | Basement at Sahid Palace Executive Apartment, Jakarta | PT. Jaya Konstruksi | 20,000 | M² | Hydrocap |
| | | Roofing at Plaza Bintaro | PT. Dimensi Engineering Const. | 4,610 | M² | Sopralene 4 S/P |
| | | Roofing at Air Limbah Perum Peruri Building | PT. Adiawira Pratama | 1,000 | M² | Curnoir |
| | October | Toilet, Talang & Daag of 4th Floor Sunter Mall, Jakarta | PT. Reka Arco Mindo Utama | 600 2,500 | M² M² | Curnoir Eshagum 3 S/P |
| | | Flat Roof at BPD Building, Jl. Praga 12 | PT. BUMINDO GANESHA PT. LALOLO | 600 | M² | Eshagum 3 S/P |
| | | Roofing of colling tower & roofing at an angle for Puri Bank Exim, Jl. Gatot Subroto, Jakarta | PT. Waskita Karya | 2,900 | M² | Soprasun |
| | December | Dak of roofing at Paiton Building, Probolinggo | PT. Berca Ind. | 500 | M² | Asphalt Felt |
| | | Roofing at BHS Bank Building, Pd. Gede | PT. Hutama Kurnia Bangun | 500 | M² | Eshagum 3 S/P |
| | | Roofing at YKK - Tangerang | PT. Kadi International | 2,000 | M² | Eshagum 3 S/P |
| | | Mr. Idris Ranadipura Residence Jl. Bintaro Menteng Raya Blok PG 1 No. 26 Sektor V, Bintaro Raya, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 600 | M² | Sopealene 3 S/P |
| 1993 | January | Basement & Wall at Bank Indonesia, Jakarta | PT. Waskita Karya | 17,065 | M² | Hydrocap |
| | | Tekhno gas & corestorages PPPTMGB Lemigas | PT. Bimo Bhaskara Sakti | 500 | M² | Eshagum 3 S/P |
| | | Roofing at Pondok Cabe Golf, Jakarta | PT. Patama Adijaya Steel | 560 | M² | Eshagum 3 S/P |
| | | Basement, Roofing & Reservoir at Bapindo Tower, Jl. Jenderal Sudirman, Jakarta | PT. Pembangunan Perumahan | 36,740 | M² | Sopralene 3 S/P |
| | | Toilet & Roofing at PPPTMGB Lemigas, Cipulir | PT. Dharma Niaga | 1,100 | M² | Eshagum 3 S/P |
| | February | Roofing at Museum Pusaka TMII, Jakarta | PT. Ideal Raya Cipta Kontraktor | 600 | M² | Sopralene 3 S/P |
| | | Basement & Roofing at BDN, Yogyakarta | PT. Pembangunan Perumahan | 2,500 | M² | Soprasun 3 S/P |
| | March | Ground tank, Pit lift, Toilet, Roofing & Water-tank at BI Building, Balikpapan | PT. Adhi Karya Cabang VIII | 4,000 | M² | Sopralast 3 S/P |
| | | Reservoir & Water treatment at Perum Peruri | PT. Adiwira Pratama Cipta | 750 | M² | Eshagum 3 S/P |
| | April | Basement at Gondangdia Apartment | PT. Nusa Raya Cipta | 7,000 | M² | Sopralene 3 S/P |
| | | Roofing, Genset & Reservoir at Plaza Bintaro | PT. Dimensi Engineering Contr. | 2,985 | M² | Sopralene 3 S/P |
| | | Roofing at Kandantel Building | PT. Budi Agung Wibawa | 1,112 | M² | Curnoir |
| | May | SMAK II | PT. Astakona Bangun Mandiri | 1,200 | M² | Sopralene 3 S/P |
| | | Kemang Club Villas Swimming Pool | PT. Putra Duta Anggada | 500 | M² | Sopralene 3 S/P |
| | May | SMAK II | PT. Astakona Bangun Mandiri | 1,200 | M² | Sopralene 3 S/P |
| | | Kemang Club Villas Swimming Pool | PT. Putra Duta Anggada | 500 | M² | Sopralene 3 S/P |
| | June | Roofing & Canopy at OPMC, Denpasar | PT. Nyndia Karya Cabang III | 630 | M² | Sopralene 3 S/P |
| | | Roofing & Canopy at OPMC, Surabaya Utara | PT. Nyndia Karya Cabang III | 500 | M² | Sopralene 3 S/P |
| | | Roofing & Canopy at OPMC, Surabaya Selatan | CV. Bumi Raya | 615 | M² | Sopralene 3 S/P |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1992 | December | Roofing at HSM Canteen renovation, Cilegon | PT. Aditya Kontraktor | 910 | M² | Sopralene 3 S/P |
| | | Telkom OPMC, Jakarta | PT. Budi Agung Wibawa | 773 | M² | Curnoir |
| | | Roofing at BNI Building, Ambon | PT. Jati Wirya Guna | 600 | M² | Eshagum 3 S/P |
| | | Roofing at BNI Building, Manado | PT. Adhi Mangunggal Prana | 1,000 | M² | Sopralene 3 S/P |
| 1992 | January | Roofing at L.E.N Industri Pesawat Terbang Building - Bandung | PT. BUMINDO GANESHA PT. LALOLO | 1,160 | M² | Eshagum 3 S/P |
| | April | Perum Peruri Karawang | PT. Duta Graha Indah | 9,000 | M² | Eshagum 3 S/P |
| | | Carita Hotel, Anyer | PT. Duta Graha Indah | 900 | M² | Curnoir |
| | May | Roofing at 7 th Floor in Departemen Pertanian Building, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 650 | M² | Sopralene 3 S/P |
| | July | Basement at Puri Bank Exim, Jakarta | PT. Waskita Karya | 8,000 | M² | Eshagum 3 S/P |
| | | STP & Ground Reservoir at Mangga Dua Court, Jakarta | PT. Pembangunan Perumahan | 990 | M² | Sopralene 3 S/P |
| | | Roofing at Manis Building, Tangerang | PT. Abagus Citra Engineering | 645 | M² | Sopralene 3 S/P |
| | August | Renovation of Strategic & International Studies Building, Tanah Abang, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 1,000 | M² | Eshagum 3 S/P |
| | | Renovation of Singapore Embassy, Jakarta | PT. Eka Widuri Kencana | 1,100 | M² | Sopralene 3 S/P |
| | | Pajak Hongkong, Medan | PT. Karsa Wiyana | 1,700 | M² | Eshagum 3 S/P |
| | | Renovation of American Embassy, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 500 | M² | Sopralene 3 S/P |
| | October | Dusit Hotel, Balik Papan | PT. Kaliraya Sari | 4,800 | M² | Sopralene 3 S/P |
| | | Renovation of Blok-M Plaza, Jakarta | PT. Pakuwon Subentra Anggraini | | Sopralene 3 S/P |
| | | Basement at Asean Hotel, Medan, Sumatera Utara | PT. AIHO | 2,800 | M² | Eshagum 3 S/P |
| | | Roofing at Belawan Combined Styles Power Plant Block-1 | PT. SIEMENS | 600 | M² | Sopralene 3 S/P |
| | | Renovation of Production Building PT. Krakatau Steel, Jakarta | PT. Admiral | 1,700 | M² | Sopralene 3 S/P |
| | | Roofing at Harco Building, Jakarta | PT. Harco Indah | 2,100 | M² | Sopralene 3 S/P |
| | | Roofing at Belawan Combined Styles Power Plant Block-1 | PT. SIEMENS | 600 | M² | Sopralene 3 S/P |
| | | Renovation of Production Building PT. Krakatau Steel, Jakarta | PT. Admiral | 1,700 | M² | Sopralene 3 S/P |
| | | Roofing at Harco Building, Jakarta | PT. Harco Indah | 2,100 | M² | Sopralene 3 S/P |
| | | PT. Putra Duta Anggada | | | | |
| | November | BI Building, Manado | PT. Adhi Karya | 1,500 | M² | Sopralene 3 S/P Sopralene 250 Granules |
| | | Roofing at Mangga Dua Court Apartment, Jakarta | PT. Pembangunan Perumahan | 1,300 | M² | Sopralene 3 S/P |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1991 | December | Daag of roofing at Wisma Nugraha Building, Jl. Raden Saleh No. 6, Jakarta | PT. Torakon Prasojo | 600 | M² | Sopralene 3 S/P |
| | | Watertank at Perumnas ex. Pluit Kemayoran | PT. Global Tata Semesta | 2,000 | M² | Soprasun 3 S/P |
| 1991 | September | Roofing at BII Building (addition), Semarang | PT. Adhi Karya Cabang III | 2,650 | M² | Sopralene 3 S/P |
| | | Basement at Pondok Club Villas II Jl. Jagorawi, Lebak Bulus, Jakarta | PT. PP Taisei Indonesia Const. | 1,800 | M² | Soprasun 3 S/P |
| | | Basement at Dharma Niaga Building, Jakarta | PT. Adhi Karya Cabang IV | 7,600 | M² | Sopralast 3 S/P |
| | October | Duta Plaza Building, Bali | PT. Prambanan Dwi Apaka | 2,623 | M² | Sopralene 3 S/P |
| | November | IE Crystal Apartment | PT. Metro Ling Gapermai | 1,500 1,000 | M² M² | Sopralene 3 S/P Soprasun 3 S/P |
| | December | Roofing renovation at Kansum BRI Building Jl. Veteran, Jakarta | CV. Permata Sari | 1,000 | M² | Sopralene 3 S/P |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1991 | April | BCA Building, Hayam Wuruk, Jakarta | PT. Sarana Perkasa | 500 | M² | Soprasun 3 S/P |
| | | St. Ursulla School, Serpong | PT. GrahitaWicaksanaSadwiyana | 500 | M² | Soprasun 3 S/P |
| | | Pharos Indonesia | PT. Total Bangun Persada | 930 | M² | Soprasun 3 S/P |
| | May | Kartika Chandra Hotel, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 1,300 | M² | Sopralene 3 S/P |
| | | Basement Renovation at Kapal Api Building, Jl. Taman Jati Baru No. 1-3, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 935 | M² | Sopralene 3 S/P |
| | | Jakarta Japanesse School (JJS), Jl. Cilandak, Jakarta | PT. PP Taisei Indonesia Const. | 500 | M² | Soprasun 3 S/P |
| | | Renovation at Pertamina Hospital Jakarta | PT. Graha Wisata | 500 | M² | Sopralene 3 S/P |
| | | Basement at Pelni Building, Jakarta | PT. Pembangunan Perumahan | 2,500 | M² | Soprasun 3 S/P |
| | | Reservoir at Textile Factory, Cikupa | PT. Inter Incomex | 850 | M² | Sopralene 3 S/P |
| | July | Roofing at Office Building - Bekasi Spinning Factory No. 2, Mall Cibitung | PT. PP Taisei Indonesia Const. | 2,000 | M² | Sopralene 3 S/P Soprasun 3 S/P |
| | | Roofing at Maintenance Support Facility Airport Building - Cengkareng | PT. Wijaya Karya | 4,264 | M² | Soprasun 3 S/P |
| | | Tendean Office Building, Jakarta | PT. Putra Duta Anggada | 800 | M² | Soprasun 3 S/P |
| | | Pertamina Hospital, Jakarta | PT. Swaparta | 700 | M² | Sopralene |
| | August | Roofing at BDN Building, Palu | PT. Trio Sakti Kencana | 950 | M² | Sopralene 3 S/P |
| | | Roofing at PPC Krakatau Steel, Cilegon | PT. Masuji & Co. | 550 | M² | Sopralene 3 S/P |
| | September | Toilet's roofing at BII Building, Medan | PT. Karsa Wiyana | 2,145 | M² | Sopralene 3 S/P |
| 1991 | January | Basement at BII Building, Medan | PT. Karsa Wiyana | 3,355 | M² | Sopralene 3 S/P |
| | | Toilet & Floor 7 th. at Sarinah Building, Jakarta | PT. Adhi Karya | 700 | M² | Soprasun 3 S/P |
| | | Roofing & Canopy at Pasar Asemka | PT. Dicivory | 1,500 | M² | Soprasun 3 S/P |
| | February | Basement & Roofing at Galaxy Indo, Pulo Gadung | PT. Nusa Raya Cipta | 2,340 | M² | Sopralast 3 S/P Soprasun 3 S/P |
| | March | Roofing at Japanese Embassy, Jl. M.H. Thamrin, Jakarta | PT. PP Taisei Indonesia Const. | 420 | M² | Sopralene 3 S/P |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
1990 | May | Basement & Roofing at Pindo Deli Building | PT. Budi Agung Wibawa | 1,600 | M² | Sopralene 3 S/P |
| | July | Basement at Duta Metropolitan Hotel Jl. Pal Putih No. 197, Jakarta | PT. Citra Perdana Nusantara | 800 | M² | Sopralast 3 S/P |
| | | Ground Reservoir, Genset Room, Toilet, AHU Room, Septiptank & Roofing at BBD, Jambi | PT. Adhi Karya Pusat | 755 | M² | Sopralast 3 S/P |
| | August | Roofing & Toilet at Pondok Club Villas Jl. Jagorawi, Lebak Bulus, Jakarta | PT. PP Taisei Indonesia Const. | 2,700 | M² | Soprasun 3 S/P |
| | | Ground tank, Pit Lift, Toilet, Roofing Level, Contilever & Watertank at Bank Indonesia Jl. Imam Barjo, Semarang | PT. Adhi Karya Cabang III | 4,035 | M² | Sopralene 3 S/P |
| | September | BDN Building, P. Gadung, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 1,400 | M² | Sopralene 3 S/P |
| | | Renovation of Pertamina Building, Jl. Perwira No. 2, Jakarta | PT. Kanaka Marga | 1,370 | M² | Sopralene Granules |
| | October | Basement at Segitiga Senen, Jakarta | PT. Total Bangun Persada | | M² | Sopralene 3 S/P |
| | | PT. Kharisma, Sunter Podomoro, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 820 | M² | Soprasun 3 S/P |
| | | Plat, Kartilevel, Toilet, Pantry & Ground Tank at BII Building, Bandar Lampung | PT. BUMINDO GANESHA PT. LALOLO | 500 | M² | Soprasun 3 S/P |
| | | Basement at Furniture Center Jl. R. S. Fatmawati, Jakarta | PT. Pisbo Jaya Mandiri | 6,000 | M² | Sopralene 4 S/P |
| | November | Pemrosesan Jahe & Manisan untuk Penampungan at Cileungsi | PT. Pisbo Jaya Mandiri | 6,000 | M² | Sopralene 4 S/P |
| | | Roofing at Bag. Annex, Sarinah Building, Jakarta | PT. Graha Cipta Hadiprana | 1,200 | M² | Soprasun 3 S/P |
| | December | Roofing at Bag. Annex, Sarinah Building, Jakarta | PT. Adhi Karya | 2,700 | M² | Soprasun 3 S/P |
| | | | | | | |
| 1990 | January | Roofing fl.4 at Borobudur Intercontinental Hotel, Jl. Lapangan Banteng Selatan, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 1,800 | M² | Sopralast 4 S/P |
| | | Roofing at Drs. Joseph Susilo Residence Bukit Golf Kav. 35, Pondok Indah, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 605 | M² | Sopralene Granules |
| | February | Basement Dak Beton at Kalibata Mall | PT. Duta Graha Indah | 1,590 | M² | Sopralast 3 S/P |
| | | Basement at Gedung Taspen, Padang | PT. Caraka Angga Buana | 910 | M² | Sopralast 3 S/P |
| | March | Roofing at R.S. Graha Medika, Jakarta | PT. Budi Agung Wibawa | 4,000 | M² | Sopralast 3 |
| | | Basement at Century Plaza Building | PT. PP Taisei Indonesia Const. | 5,000 | M² | Sopralene |
| | | Roofing at Radiology RSCM, Jl. Dipenogoro No. 71, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 690 | M² | Sopralene 250 Granules |
| | | Roofing at Kelapa Gading Plaza, Jakarta | PT. Nusa Kirana R.E (Summarecon Agung) | 1,300 | M² | Sopralast 3 S/P |
| | | Basement & Daag of Roofing at Radiology RSCM, Jakarta | PT. Budi Agung Wibawa | 850 | M² | Curnoir |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1990 | January | Roofing fl.4 at Borobudur Intercontinental Hotel, Jl. Lapangan Banteng Selatan, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 1,800 | M² | Sopralast 4 S/P |
| | | Roofing at Drs. Joseph Susilo Residence Bukit Golf Kav. 35, Pondok Indah, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 605 | M² | Sopralene Granules |
| | February | Basement Dak Beton at Kalibata Mall | PT. Duta Graha Indah | 1,590 | M² | Sopralast 3 S/P |
| 1989 | June | Bank Bumi Daya Building, Jakarta | PT. Adhi Karya | 2,245 | M² | Sopralast 3 S/P |
| | July | Perkantoran BRI Ujung Pandang Building | PT. Duta Tehnik Indonesia | 2,500 | M² | Sopralast 3 S/P |
| | | Departemen Penerangan Building, Jl. Merdeka Barat No. 9, Jakarta | PT. Pradia Utama | 2,955 | M² | Sopralast 3 S/P |
| | September | Basement at Graha Medika, Jakarta | PT. Budi Agung Wibawa | 4,700 | M² | Sopralast 3 S/P |
| | | Roofing at Borobudur Intercontinental Hotel, Jl. Lapangan Banteng Selatan, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 720 | M² | Sopralast 4 S/P |
| | | Roofing at ABD. HSM Building, Krakatau Steel | CV. Gondangdia Raya | 750 | M² | Sopralast 3 S/P |
| | | PTP X Lampung Building | PT. Tanjung Kukuh | 2,300 | M² | Curnoir |
| | November | PT. Pumar Cold Stored Komplek Perikanan Muara Baru, Jakarta | PT. Samudra Jaya | 650 | M² | Sopralast 3 S/P |
| | | Tunnel, Hangar 1 GMF at Soekarno-Hatta Airport - Cengkareng | PT. Pembangunan Perumahan | 5,000 | M² | Sopralast 3 S/P |
| | | Residence at Jl. Yusuf Adiwinata 56-58, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 1,000 | M² | Sopralast 3 S/P |
| | | | | | | |
| 1989 | January | Roofing at Sekolah Tinggi Ekonomi & Perbankan Indonesia Building | PT. Panca Wisesa Andika | 500 | M² | Curnoir & Sopralast |
| | | Roofing & Toilet at Bank Niaga Building Jl. Falatehan I/27, Jakarta | PT. Total Bangun Persada | 900 | M² | Sopralast 3 S/P |
| | | Roofing, Pump House & Reservoir Tank at Gelanggang Renang Taman Impian Jaya Ancol | PT. Jaya Konstruksi MP | 660 | M² | Sopralast 3 S/P |
| | | Roofing in H.B. Yassin Building - TIM at Jl. Cikini No. 37, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 1,200 | M² | Sopralast 3 S/P |
| | | Roofing at Graha Bhakti Hudaya Building TIM - Jl. Cikini No. 37, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 645 | M² | Sopralast 3 S/P |
| | February | Reservoir at Batan - Serpong | PT. AEPE Pluit Bataco Co. Raya | 1,000 | M² | Sopralast 3 S/P |
| | March | Exhibition at Grand Preanger Hotel, Bandung | PT. Total Bangun Persada | 6,550 | M² | Sopralast 3 S/P |
| | April | Marubeni Housing at Pondok Indah, Jakarta | PP - Taisei - Dextam J.O. | 1,670 | M² | Sopralast 3 S/P |
| | May | Roofing Renovation at Papan Sejahtera Building. Jl. H.R. Rasuna Said Kav. C-1, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 1,005 | M² | Sopralast ARD |
| | | Efei Batan Renovation, Serpong | PT. Djasa Uber Sakti | 2,500 | M² | Sopralast Flam 180 ALU |
| | June | Radiology RSCM Building, Jakarta | PT. BUMINDO GANESHA PT. LALOLO | 675 | M² | Sopralast ARD |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1988 | August | Ali Sadikin Residence at Jl. Jati Murni | PT. BUMINDO GANESHA PT. LALOLO | 500 | M² | Sopralast 4 S/P |
| | | Anjungan DKI Jakarta - TMII | PT. BUMINDO GANESHA PT. LALOLO | 1,500 | M² | Vibament |
|
| | November | Roofing at Yayasan Jantung Indonesia | PT. Duta Tehnik Indonesia | 500 | M² | Sopralast 4 S/P |
| | December | Roofing at Theater Imax Keong Emas - TMII | PT. Wijaya Kusuma Kontraktor | 500 | M² | Sopralast ARD |
| 1988 | April | Roofing at International Cosmetic Building | PT. BUMINDO GANESHA PT. LALOLO | 1,050 | M² | Sopralast |
| | June | Roofing at Masjid Agung - Bandung | PT. BUMINDO GANESHA PT. LALOLO | 2,600 | M² | Sopralast |
| | | Toilet & Residence Lt. 6 & 7 at Sarinah Building, Thamrin - Jakarta | PT. Adhi Karya Cabang I | 700 | M² | Sopralast |
| | July | Roofing at Rumah Sakit Islam Jakarta | PT. Multi Kontrindo Perkasa | 500 | M² | Curnoir |
| | | Bimantara Group | | | | |
| | | Roofing at Mess Building RII Batan - Serpong | PT. Kaliraya Sari | 1,300 | M² | Sopralast |
| | | Roofing at AMSC Building | Chiyoda - Kaliraya Sari, JO | 2,300 | M² | Sopralast |
| | August | Joglo Sasono Utomo, Sasono Langgen Budoyo & Sasono Adiguno - TMII | PT. Wijaya Kusuma Kontraktor | 3,000 | M² | Sopralast 4 mm/Expose ARD |
| | | | | | | |
| 1987 | January | Basement Exhibition at PT. Branta Mulia | PT. Argha Indah Pratama | 1,600 | M² | Sopralast |
| | August | Roofing at G.M.F at PT. Hangar 3 | Hutama - Takenaka - PP -Taisei J.O. | 1,800 | M² | Sopralast |
| | October | Roofing at Museum Transportasi -TMII | PT. Wijaya Kusuma Kontraktor | 2,325 | M² | Sopralast ARD |
| | November | Roofing at Jl. Kayu Putih, Jkt | PT. Ganesha Mustiarti | 800 | M² | Curnoir |
| | | Roofing & Toilet at Jl. Nuri No. 1, Jakarta | PT. Imesco Dito | 500 | M² | Curnoir |
| | | Roofing at Jasa Marga Building, Jl. Tol - TMII | PT. Imesco Dito | 700 | M² | Curnoir |
| | | | | | | |
| 1986 | January | Renovation at Deplu Building | PT. Wijaya Kusuma Kontraktor | 1,200 | M² | Colphene |
| | September | Renovation of Gutter Main Building at PT. Branta Mulia - Citeurup | PT. BUMINDO GANESHA PT. LALOLO | 1,180 | M² | Sopralene 250 Granules |
| | November | Basement at MAWI Building | PT. Wijaya Kusuma Kontraktor | 600 | M² | Colphene |
| | | | | | | |
| APPLICATION DATE | P R O J E C T S | MAIN CONTRACTOR | A R E A | MATERIAL |
| 1985 | July | Roofing at Engine Test Center (ETC) Nurtanio IV - Bandung | PT. Wijaya Kusuma Kontraktor | 3,000 | M² | Asphalt Felts |
| | October | Basement at Gedung Pemda Jawa Barat | PT. Pataruman | 3,500 | M² | Colphene |
| | December | Reservoir at G.M.F. Utilities Building J.LA | PT. M.B.R.C | 3,325 | M² | Colphene |
| | | | | | | |
| | | | | | | |